One point of contact for the whole road from an idea to a filed permit application. You know what you want to build. We know how to coordinate it.
A building permit for a family house is not one document but a chain of dozens of steps that have to follow each other precisely: design documentation, land survey, site investigations, utility connection designs, statements from network operators and public authorities, and finally the application itself. Projecto PRO holds that chain together. We do not draw the design or carry out measurements – we coordinate the people who do, watch deadlines and dependencies, and communicate with the building authority.
For you it means one thing: a single point of contact that knows what is done, what is missing and who is next. No need to study the Building Act or call authorities yourself.
We check the plot and your plans, recommend a procedure and set a schedule. We arrange and coordinate the architect, the surveyor (elevation and site plan), hydrogeological, geotechnical and radon surveys, utility connection designs and, where needed, a wastewater treatment plant or a well. We obtain statements from network operators and authorities and feed their requirements back into the documentation.
We file the complete application for the building permit on your behalf through the Builder's Portal and communicate with the building authority until its decision. If the authority asks for additions, we coordinate them with the architect and the specialists.
If you have chosen a catalogue house, we verify its suitability for your plot and arrange the siting and follow-up steps. For an individual design we coordinate the work with the architect from concept to permit documentation. The coordination fee is fixed in both cases and listed in the price list below; design documentation, surveys, geodetic work, administrative fees and external specialists are billed separately.
Projecto PRO does not guarantee that a permit will be issued or how fast the authority decides – that is always up to the building authority and the public bodies involved. Our commitment is that the documentation is complete, filed on time, and that no step is left for you to handle alone.
Fill out the form and we’ll schedule a meeting.
We review your project, assess the land and propose the best path to permit.
We prepare a clear roadmap for the whole process.
We define required documents, set a timeline and arrange all specialist work.
We gather all required documents and materials.
We coordinate the designer, surveyor and other specialists to ensure complete documentation.
We finalize the documentation and handle the authorities.
We prepare and submit the application, then follow up with the office until the decision is issued.
CZK 29,900
CZK 22,000
One-time fee
Obtaining a building permit for a catalogue family house.
CZK 34,900
CZK 27,000
One-time fee
Obtaining a building permit for a custom-designed family house.
Price based on scope
Tailored offer
Services beyond the standard scope of family house construction.
The price includes our complete engineering activity leading to the submission of the building permit application. Costs for project documentation, surveys, geodetic work, administrative fees and services provided by external specialists are billed separately. You will receive an exact quotation after a free consultation.
It depends on the complexity of the project, the location and the authorities' requirements. Preparing the documents before filing usually takes several months; we set a realistic schedule after the first consultation.
No. We handle communication with the authority and file the application through the Builder's Portal for you.
That is fine. We coordinate your architect as well; what matters is that the design ties in with the other documents.