Not every plot is a building plot. We check what the zoning plan allows and coordinate the steps that turn the land into a place for your house.
Buildability is decided mainly by the municipal zoning plan and the type of land in the Land Registry. Arable land, a garden or permanent grassland within a developable area requires withdrawal from the agricultural land fund; a plot outside the developable area may need a change of the zoning plan, which is a long process with its own rules. Before you buy or design, it pays to know which situation the plot is in.
We check the zoning plan, the regulatory conditions and the limits in the area (protection zones, flood zone, access). We prepare the documents for withdrawal from the agricultural land fund, including the calculation of levies, and coordinate the statements of the municipality, the agricultural land protection body and other authorities. The result feeds directly into preparing the permit documentation.
If the plot requires a change of the zoning plan, we tell you plainly, including a realistic time frame and costs – the change is approved by the municipality and cannot be guaranteed.
Fill out the form and we’ll schedule a meeting.
We review your project, assess the land and propose the best path to permit.
We prepare a clear roadmap for the whole process.
We define required documents, set a timeline and arrange all specialist work.
We gather all required documents and materials.
We coordinate the designer, surveyor and other specialists to ensure complete documentation.
We finalize the documentation and handle the authorities.
We prepare and submit the application, then follow up with the office until the decision is issued.
CZK 29,900
CZK 22,000
One-time fee
Obtaining a building permit for a catalogue family house.
CZK 34,900
CZK 27,000
One-time fee
Obtaining a building permit for a custom-designed family house.
Price based on scope
Tailored offer
Services beyond the standard scope of family house construction.
The price includes our complete engineering activity leading to the submission of the building permit application. Costs for project documentation, surveys, geodetic work, administrative fees and services provided by external specialists are billed separately. You will receive an exact quotation after a free consultation.
Levies are calculated from soil quality and area; the calculation is part of the documents we arrange.
It depends on the zoning plan. A garden within a developable area usually yes after withdrawal; outside it generally not.